Eurolink has delivered to the company Strait of Messina the documentation relating to the update of the final design of the bridge and the road and rail connection works. According to a press release, "the designer's report illustrates in detail the design changes and updates, to be developed in the executive project, to take into account the new technical regulations for construction and the resulting changes in geological modeling and geotechnical characterization, the necessary adjustments to safety standards and technical design manuals, environmental requirements, technological developments in construction. “The environmental documentation, notably the environmental impact study, the environmental impact study, and the landscape report, will also be updated".
|